Posts

Showing posts with the label Zaidun Leeng (Sabah) Sdn. Bhd. Lembaga Arkitek Malaysia

Explanation of My Email to the Chief Minister (Part 1)

Image
  You may find the email to the Chief Minister HERE .  The development plan approved by DBKK was based on falsified as-built survey plans by Jurukur Terra Firma, fabricated amendments by Arkitek LYS, and involved consultant engineers Zaidun Leeng (Sabah) Sdn. Bhd. Justifications for the above claim: The as-built drawing for Lot S7 (House No. 11) indicates a road height of 29.65m, higher than the house platform at 28.95m. However, photographic evidence clearly shows the road is lower than the house platform. LINK .