Posts

Showing posts with the label defect liability period

Water leakage and possible sink holes in the future

Image
  There have been several articles in our Daily Express about water woes in Sabah. On 10.3.2023 when I mentioned the water leakage at S9 (Lot 15) at Vistana Heights many of the professionals including one of 2 residents of Vistana Heights, who were present at the meeting badgered me into answering their question on how much is the water bill for Lot 15. As mentioned by me several times the most stressful thing is to deal with idiots who cannot think.

The meeting with KKTP on 10.3.2023 – Part 1

Image
  The meeting on 10.3.2023 on the Vistana Heights issues highlighted a few important matters: i.                      the Local government and housing authority (KKTP) confirmed that the infrastructure has not been taken over by DBKK. ii.                    KKTP confirmed that the defect liability period is not over due to the Covid 19 extension. iii.                  the road was ordered by KKTP to be raised so that the driveways are not steep. iv.                  the bank guarantee deposited by the developer has not been released.