MINUTES OF MEETING with DBKK on 11th June 2025.
Click on image to see expanded version This meeting was a follow up of the first meeting held on 5.5.2025. The minutes: 2.1 The meeting was informed that Sr. Robert (the surveyor) had re-verified the Survey Plan that was reviewed, and the results of the review were communicated to the Kota Kinabalu City Hall. The re-verification results found that the height level of the road in front of Lot S9 is 31.05m (101.87 feet) Average Mean Sea Level (AMSL), compared to the level stated in the Development Plan Approval (Year 2018) which is 31.09m (102 feet) AMSL; i) Development Plan: 31.09 m (102 feet) ii) As-built survey plan: 31.04m (101.87 feet) Difference in height: 0.04m (0.13 feet) My thoughts: Firstly, the figure 31.05m is not on the as-built survey. Sec...