My eamil to LJS and JTU on 7th August 2025

 

                                                 Click on the image above for a clearer view.

From:luqmanm2002@yahoo.co.uk

To:jtu@sabah.gov.my,ljsabah@gmail.com

Cc:SYLVIA.CHIN@SABAH.GOV.MY,Sulong.Matusin@sabah.gov.my,

Robert.Millip@sabah.gov.my,Mohammad.AbdSani@sabah.gov.my,

Jaswan.Jamaludin@sabah.gov.my


Thu 7 Aug at 09:36

Dear Sr. Bernard Liew Chau Min,

I have copied this email to several other officers of JTU as I don't have another 2 years to wait as time is of essence.Hopefully anyone of you at JTU/LJS would respond. 

I refer to your letter (Ref: LJS. 20 Vol. 1/83) dated 15 July 2025, in which you identified DBKK as the authority for the as-built survey plans for Taman Puncak Vistana, Iramanis.

However, in a letter dated 15 January 2025, En. S. Dzulkarnain S. Abdillah stated, “The Board is still looking into your complaint about the as-built survey plans for Taman Puncak Vistana, Iramanis, due to further verification from the authority.” Despite several follow-up emails to LJS seeking clarification on the identity of this authority, I received no response. Additionally, during a meeting on 5 May 2025, Sr. Lifred Wong, Director of DBKK, confirmed that DBKK is not the authority referenced by En. Dzulkarnain.

Clarification on Authority: Please confirm which entity was referred to as the “authority” in En. Dzulkarnain’s letter of 15 January 2025 and address the apparent discrepancy.

Furthermore, you stated that there was no misconduct by the licensed surveyor responsible for the as-built survey for Vistana Heights. I seek clarification on the following anomalies in the survey:

Height Discrepancies Opposite Unit S9:

The as-built survey indicates heights opposite the gate at 31.74m (104.13 feet) and 32.11m (105.35 feet), with the platform height at 32.38m (106.23 feet).

This results in height differences of 2.10 feet (106.23 – 104.13) or 0.88 feet (106.23 – 105.35) between the platform and road levels.


                                             Click on image above now added

The 1998 development plan, however, specifies a height difference of 4.26 feet (106.26 – 102 feet). Please explain how these figures reconcile.

Anomaly at Unit S7 (House No. 11):

The as-built survey shows a platform height of 28.95m (95.08 feet) and a road height of 29.65m (97.28 feet), suggesting the platform is lower than the road.

However, photographic evidence (available at LINK) clearly shows the platform is higher than the road. Please clarify this discrepancy.

Platform Height Differences:

The as-built survey and the 1998 development plan show significant differences in platform heights for the following units:

S21: 36.34m (119.22 feet) vs. 112.56 feet (6.66 feet difference)

S22: 36.34m (119.22 feet) vs. 112.56 feet (6.66 feet difference)

S28: 41.91m (137.50 feet) vs. 134.47 feet (3.03 feet difference)

Please provide an explanation for these discrepancies.

Development Plan Approval Timing:

The 1998 development plan was approved in 2018, after the completion of the development. Typically, development plans are submitted and approved before construction begins. This late submission raises concerns about whether the developer sought retrospective approval or amendments to an earlier plan. Please clarify the sequence of events and the rationale for this approval process.

Drainage Reserve Representation:

During my tenure as manager at Jurukur N. Kandiah Sdn. Bhd., I learned that as-built survey plans should reflect actual site conditions, including changes such as a collapsed or slipped drainage reserve on a cliff. The as-built survey for Vistana Heights appears to show the drainage reserve as it was originally, without noting any changes. LINK 

Please confirm whether the as-built survey accurately reflects the current state of the drainage reserve and, if not, how this aligns with your statement that there was no misconduct by the licensed surveyor.

I appreciate your prompt attention to these matters and look forward to your detailed response to each point raised.

Yours sincerely,

Luqman Michel

Comments

Popular posts from this blog

Bad experience with Sabah architects

SPRM (MACC) and Vistana Heights

Are architects liable for fabricated documents submitted to authorities